Learn / Manage the Position · Lesson 1 of 4

Intermediate

Position sizing and risk budgets

Prerequisites: Core option structures · Bull call debit spread

01 · Overview & Worked Setup

Size is how many contracts you can hold if the stated worst case hits. For a defined-risk debit spread, that worst case is the net debit (or width minus credit) plus fees, times contracts. Floor the budget. Leftover dollars do not buy a fraction of a listed contract.

A naked short call has no bounded maximum loss. There is nothing honest to divide by. A spread also does not erase assignment, dividend, or gap risk — it only caps the option-payoff sketch at expiration under the usual one-underlying assumption.

Teaching lab

Loss budget into whole contracts

Fees sit inside the per-contract unit. Naked options with no bounded maximum loss cannot be sized by dividing the budget by a made-up cap.

50$ – 2000$
50$ – 800$
$Budget500Reserved442.6
Values in $; bars extend from zero. Negative values are losses when the measure is P/L.
Budget
500 $
Reserved
442.6 $
Contracts
2

Each unit is $221.30 including $1.30 fees.

Reserved
$442.60

What this scenario means

A defined-risk debit spread can be floored into whole contracts. A naked short call cannot. A spread also does not remove assignment, dividend, or liquidity risk.

Guided challenge

Check unbounded. Why does the lab refuse to print a contract count?

Educational simulation only. Hypothetical results are not forecasts or trade recommendations. Hypothetical classroom numbers. One standard contract is 100 shares unless labeled otherwise. Not a live quote, not a fill, and not a probability forecast.

Next: Assignment and exercise →

02 · Order Tickets Step by Step

How to enter and exit this structure

BTO (buy to open) · STO (sell to open) · BTC (buy to close) · STC (sell to close). Illustrative fills only. We never send these orders.

Step 1 — Open the position

BTO (buy to open)

Open only the contracts the budget allows

$500 budget, bull call spread max loss $220, fees $1.30: per unit $221.30, floor(500 / 221.30) = 2 contracts, $442.60 reserved.

STO (sell to open)

Do not size unbounded shorts from a budget ratio

A naked $105 call credit of $250 does not make max loss $250. The lab refuses a contract count when max loss is unbounded.

03 · Worked example: $500 budget, $220 defined loss

MSFT teaching debit spread: max loss $220 per contract. Add $1.30 fees → $221.30. $500 / $221.30 floors to 2. A third contract would need $663.90.

If the same $500 is applied to a naked call, the answer is not 'two contracts'. It is 'this structure is not sized from a bounded cap'. Use a defined-risk structure or stand aside.

04 · Assumptions and limits

Fees are a teaching $1.30 per contract. Broker commissions, assignment fees, and margin differ. 100-share multiplier is the standard listed unit unless the contract was adjusted.

05 · How the Greeks move

Doubling contracts doubles dollar Greeks. Concentration in one name is a sizing choice as much as a Greek choice. See Portfolio Greeks after you can size one structure.

Checking for a quiz…

Teaching numbers only — not a live quote, not a fill, not financial advice. All lessons · Back to Practice · Replay · Journal.

Trades | Learn. Practice. Analyze. Improve.